News
News
NEWS AND INFORMATION
News
Home /
  • >News
  • - News

    Ultra-WideTemperedGlass:6mWidthCapacityandProcessControl|XunYuanGlass 2. Ultra-WideTemperedGlassProcessingandPanelDivisionGuide|XunYuanGlass

    2026-09-29

    Thecorecapabilityfigureforultra-widetemperedglassisamaximumprocessingwidthof6m,withamaximumpanelof6m×8mandthicknesscoveragefrom5to19mm.Whatdeterminesdeliveryquality,however,isnotthefurnacewidthalonebuttheabilitytorunthatwidthconsistently—whichdependsonthreethings:heatinguniformity,coolingstresscontrol,andflatnesscontrol.HenanXunYuanGlassprocessesultra-widetemperedglasswithallstagescompletedonitsownproductionlines.

    大板 超长 名品店.jpg

    1.DivisionandJointPositions:SettledattheDetailedDrawingStage

    Panelsbeyondthefurnace'sprocessingwidthmustbedivided—aphysicallimitoftheprocess.Therealquestionisnotwhethertodivide,butwhetherthejointfallswheretheeyeacceptsit.

    Ajointacrossthevisualcentreweakensthefacade'sintegrity;ajointatamullionorcornerreducestheimpactconsiderably.Thismustbesettledatthedetaileddrawingstage.

    Thesameappliestoopeningsandnotches:thepositionofeverycut-outaffectslocalstressandthefinishededgeappearance.Openingsandnotchesarepositionedatthedetaileddrawingstage,notontheeveofinstallation,sotheedgetreatmentcanbedecidedonceratherthanreworkedlater.

    Whatwedo:Wedeterminethedivisionplanandjointpositionsduringdetaileddrawing,andconfirmopeningandnotchpositionsatthesamestage.Thishappensatthedetaileddrawingstage.Whatyougain:Youavoidfindinganunacceptablejointpositionoranedgeproblematanopeningonlyaftertheglassisfinished.

    大炉 超宽平钢.jpg

    2.ProcessCombinations:Ultra-WideTemperingandLaminated/InsulatedUnitsAreConfirmedSeparately

    Whereanultra-widepanelrequireslaminationoraninsulatedunit,notethatthetwoboundariesarenotthesame:ultra-widetemperingislimitedbyfurnaceprocessingwidth,whilelaminationandinsulatedassemblyarelimitedbytheprocessingenvelopeoftheirownlines.

    Whatwedo:Weconfirmprocess-combinationfeasibilityduringthedetaileddesignstage,statingtemperingcapacityandcomposite-structurecapacityseparately.Thishappensatthedetaileddesignstage.Whatyougain:Youavoiddiscoveringaftersigningthataparticularcombinationdoesnotapply.

    超宽 车上.jpg

    3.BaseGlassSpecification:StatedClearlyontheQuotation

    Forshopfronts,showroomsandotherappearance-criticallocations,ultra-clearbaseglassandstandardbaseglassdiffervisiblyinclarityandcolourcast.Ifthequotationstatesonly"temperedglass"withoutspecifyingthebaseglass,theclientmayonlydiscoverthedifferenceondelivery.

    Whatwedo:Baseglassisconfiguredbyprojectarea,withultra-clearglasspreferredforappearance-criticallocations;thebaseglassspecificationisstatedonthequotation.Thishappensattheselectionandquotationstage.Whatyougain:Youavoidreworkordisputeoverclaritydifferencesafterdelivery.

    IMG_7148.jpg

    4.DimensionalAccuracy:AStated,VerifiableScope

    Dimensionalaccuracyofultra-widepanelsisaffectedbybothcuttingandtempering.**Ourstatedscopeiscontrolwithinnationalstandardranges,withparameterscalibratedperorder.**Wedonotcommittofiguresbeyondprocesscapability.

    Whatwedo:Westatetheaccuracyscopeandcontrollablerangeduringquotationanddetaileddesign—noover-commitment,novagueness.Thishappensatselection,quotationanddetaileddesign.Whatyougain:Averifiablecommitmentratherthananimpressive-soundingnumber.

    5.SchedulingandDelivery:FurnaceSlotsConfirmedinWriting

    Ultra-widepanelsoccupyfurnaceslotsforlongerperiodsandmustbecoordinatedagainsttheproductionschedulewhenmixedwithstandardwork.Verbalanswersonfurnacetiminggivetheclientnobasisforscheduling.

    Whatwedo:Panelsentertheschedulingqueueoncedrawingsarefinalised;furnacetimingisconfirmedinwritingagainsttheproductionschedule.Atdelivery,liftingguidanceandloadingplanadviceareprovided,andtransportplanscanbepreparedbypanelsize.Thishappensatschedulinganddelivery.Whatyougain:Ascheduleyoucanplanagainst,withlesswaitingonsite.

    微信图片_20260621190814_697_20.jpg

    6.FourCross-CuttingActionsandSupportforDesignInstitutes

    Themeasuresaboveconvergeononesetofactions:formingverification(parametersderivedfromthedrawingatdetaileddesign),per-orderparametercalibration(heatingcurvesandcoolingpressurere-setagainsteachorder'sactualpanel),first-piececheck(onepiecemadeandapprovedbeforethebatchruns),andin-processsampling(driftmonitoredthroughoutthebatch).

    Thesedependonin-houseproductionlines:rawglasscutting,edging,washing,tempering,laminationandinsulatedassemblyallcompletedconsecutivelyinourownplant,withoutoutsourcingororderconsolidation,withparametersconfirmeddirectlybyin-houseprocessengineers.

    Supportfordesigninstitutes:

    1. Glassconfigurationadvice—baseglassandstructuralconfigurationrecommendationsbylocationandappearancerequirement.

    2. Structuralloadcalculationsupport—productinformationneededforverification.

    3. Detaildevelopment—detailedprocessingdrawingswithin24hours.

    4. Process-combinationfeasibility—temperingcapacityandcomposite-structurecapacitystatedseparately.

    Threecriteriaforbuyersanddesigners:

    1. Canthequotationbeitemised?**Stages,verificationnodesandtransportplanslistedseparately.Asinglelumpsumleavesroomforadd-onslater.

    2. Aretheproductionlinesin-house?**Ultra-widepanelsdemandhighparameterconsistency;eachoutsourcedstageaddsalayerofparameterdistortion.

    3. Isfurnacetimingconfirmedinwriting?**Averbalscheduleisnotabasisforprojectplanning.